The gas hose has the characteristics of convenient installation, reliable connection, corrosion resistance, no air blocking, good flexibility, long service life, and can be bent without deformation or gas barrier. The surface soft protective layer material is safer, easier to clean and beautiful. The stainless steel threaded metal hose has a service life of 8 years. Plastic pipes are developing steadily. PE gas pipes, PP-R gas pipes and UPVC gas pipes all have a place. The strong development of PE pipes is remarkable, and its use is also very extensive.
Gas hose construction process
When the gas hose is constructed, it is avoided to point the pipe weld to the wall surface, and the pipe with the weld seam is not obvious should be marked in advance. The installation of copper pipes or stainless steel bellows laid in the pipeline shaft has been carried out after the construction of the drawings and other pipelines. When the pipeline passes through the partition plate in the shaft, the casing should be added. There should be no less than between the casing and the pipe. 5mm spacing.
Gas hoses should not be in contact with various metals and wires; when unavoidable, they should be separated by insulating materials. The hole of the gas pipeline crossing the floor should be drilled from the upper level, and the position of the lower hole should be determined vertically by the weight of the layer. Because the wall thickness of the upper layer and the lower wall cannot be perpendicular to the line, it should be used as a wall bend to avoid the wall. The pipe is turned.
The painting of the indoor gas pipe and its pipe fittings of the gas hose shall be carried out after the verification of the actual pressure; when the steel pipe is welded, it shall be painted after the rust removal (see metal luster): first all the welds Brush two anti-rust primers, then apply two anti-rust primers and two top coats in full; when using galvanized steel pipe thread connection, the other pipe joints should be brushed with an anti-rust primer after installation. Apply two coats of paint.
It is not allowed to be in the ground in the house. The introduction of pipes in the house is aging, leakage, etc., and it takes a long time to repair and replace. In the city, it is required to dig 3 meters deep and place it on both sides of the road. As long as the quality of the outer tube is guaranteed, it is no problem to put the bottom of the sea.