How to properly debug the gas pressure regulating box?

May 20, 2019

Leave a message

We all know the gas pressure regulating box. Maybe many people don't know much about the debugging process of the gas pressure regulating box and some precautions. Now let us provide some information about this:

1. Set the pressure, follow the principle of high to low, and follow the steps one by one, namely: cut off the pressure - release the pressure - work pressure.

2. After the pressure is set, it is necessary to check the closing pressure to verify its performance and whether it meets the required value.

3. The outlet valve can be opened after the pressure setting meets the requirements. The outlet valve must not be opened before this to prevent accidents.

4, precision instruments should pay attention to protection, in order to prevent pressure fluctuations, damage to the instrument.

5. In the commissioning of 1+1 pressure regulating equipment, if uninterrupted air supply is required, the pressure should be manually controlled by bypass, the pressure regulating valve should be controlled by one hand, and the pressure gauge should be held by hand to observe the pressure change at all times to maintain the outlet pressure at the required pressure. Within the range, after the pressure regulator pressure setting is completed, slowly open the regulator outlet valve, and then close the bypass valves after the regulator is normally supplied with air.

6. If the regulator adopts 2+0 one open and one closed type, both roads need to be debugged, open one way, close one way (standby), and the air pressure between the inlet and outlet valves should be vented in the spare road to avoid the pressure regulator film and spring Pressure, causing fatigue.

7. If the regulator port uses two channels to automatically switch the air supply, the pressure parameters should be set according to the main and auxiliary roads, then the two inlet and outlet valves should be fully open. The automatic switching has higher performance requirements for the regulator, which is generally stable. The pressure accuracy is ≤2.5%, and the closing precision is ≤10. Automatic switching test: increase the main road pressure (simulation fault), make the main road pressure super high and cut off the valve action, cut off the main road gas, stop the gas supply, and observe whether the auxiliary road can start the air supply according to the set pressure. After the inspection is passed, the main circuit shut-off valve is reset, and the pressure of the main circuit regulator is adjusted back to the original set value, so that the pressure of the main and auxiliary two-way regulator is set, the main road is mainly supplied with gas, and the auxiliary road is provided. Standby, when the main road fails, the auxiliary road regulator starts by itself to realize continuous supply of air without interruption. This method is commonly used in key public welfare and industrial and commercial gas supply.

8, series monitoring regulator debugging regulator series monitoring mostly adopts the form of passive monitoring, that is, the monitoring regulator is fully open.

(1) First check whether the pressure signals of the two voltage regulators (or pilots) are correct. If the pressure signal tubes are connected after the working voltage regulator, they are connected correctly.

(2) Press the pressure regulating springs of both pressure regulators to the pressure regulating spring of the tightest front pressure regulator (monitoring pressure regulator) to make the rear pressure to the cutting pressure and debug the shut-off valve.

(3) Debug the release valve.

(4) Re-release the pressure regulating spring of the front pressure regulator (monitoring pressure regulator), so that the intermediate pressure to the outlet pressure setting value is about +10%.

(5) The pressure regulating spring of the post-release regulator (working regulator), so that the post-stage pressure reaches the outlet pressure setting value (the intermediate pressure will rise to equal the inlet pressure). Note: This debugging should be carried out under the condition of large outlet flow.

9. After the regulator is completed, use foaming agent to check the looseness of each interface and during the commissioning process, and whether there is gas leakage.